影音先锋av色图,欧美一级淫片免费播放口,欧美 亚洲 图 色 视频,中文字幕 日韩 人妻 无码,99精品欧美一区二区三区国产,激情久久免费视频

手機(jī)版
1 2 3 4
首頁 > 新聞中心 > 翻譯公司資訊 >
翻譯公司資訊

廣州翻譯公司完成機(jī)械類英文翻譯

發(fā)布時間:2019-01-22 10:15  點(diǎn)擊:

廣州翻譯公司完成機(jī)械類英文翻譯
Preface
Thank you for purchasing diesel geerators.
This operation manual will tell you how to install,use and maintain generator set correctly.
Please read this manual before using the generating set to ensure the proper operation.
Follow the instructions to keep your generating set in the best working condition and extend the life of it. IF you have any commends or problem,please contact with our sales company or the authorized agent.
This manual deals with the general items of the diesel generating set. However,the manual may vary with the development of the products in the future.
Please give special attentions to warnings and cautions. ! WARNING Failure to properly follow these precautions can result in property damage, serious injury or DEATH. ! CAUTION Indicates that the serious personal injury or equipment damage will result if the instructions are not followed.
Diesel generating set will meet your requipment if you operate it according to the manual instruction. Otherwise serious personal injury and equipment damage will result.
So,reconfirms that you must to read and understand this manual before operating the generating set.廣州翻譯公司
! ATTENTION
1.Don’t connect the generator to other power supplies.Such as main-supply of power company.In some special cases,please connect the stand-by power to electrical system by professional electrician who must know the difference between public supply and generator circuit.
2.Laymen especially the children can not realize the danger,they should keep away from the generator.廣州翻譯公司
3.Please wear suitable clothes and safety protectiove coverall.廣州翻譯公司
4.The key of door lock and electric door accessories for meter door and maintenance door of silent unit should be well kept by operations for meter door and maintenance door of silent unit should be well kept by operators.Please lock all the doors of generator tightly to operate(the children can not realize the danger).
1.TO PREVENT THE FIRE
Never add fuel to the fuel tank while the engine is running.
Wipe off the overflowed fuel oil with a clean cloth. Keep the generating set at least one meter away from the generating set.
 To prevent the fire and to provide adequate ventilation,keep the generating set at least one meter away from buildings and other equipment during operation.
 Operate the generating set on a level surface.
 Do not put the generating set indoors while the engine is hot.
 Set up extinguisher and first-aid kit in working field.
2.TO PREVENT FROM INHALING THE EXHAUST
Exhaust gas contains poisonous carbon monoxide, which is harmful to the health.
Never use the generating set at the confined places or poor ventilated locations.If it’s necessary to run the generating set indoors, be sure to provide the adequate ventilation.
Please not the warning labels on the generator.
3.BE CARE NOT TO BE SCALDED
The muffler and the engine body are very hot while the engine is running or just after running, do not touch these parts to prevent from being scalded.
4.ELECTRIC SHOCKS,SHORT CIRCUITS
To avoid electic shocks or short circuits,do not touch the generating set when your hands are wet. The generating set is not waterproof, so it should not be used in a place exposed to rain snow or water sprays. Use of the generating settor in a wet place can cause short circuits and electric shocks during operation.
The generating set should be grounded to prevent electrical shocks from faulty appliances.Connect a length of heavy wires between the generating set a ground terminal and an external ground source.
Do not hook up tools or other apparatus to generating set rator before it has been started.If equipment is attached,generator starting may cause sudden movements of the equipment and result in injuries and accidents. Be sure to disconnect any apparatus from the generating set or prior to starting.
! CAUTION
Most appliance motors require more than their rated wattage for start-up.
Do not exceed the specified current limit of any socket.
Do not connect the generating set to a household circuit.This could cause damage to the generating set and to electrical appliances in the house.
5.BATTERY USAGE
The battery of open frame generator set is optional,users should choose and buy suitable battery before operation.
The battery of open frame generator set adopts advanced technique without maintenance,users need not fill water and add electrolyte.
Observe the status displays of battery:
Blue: the battery is in good condition
White: the electricity is not enough, need to charge.
Red: the electrolyte is not enough, need to change.
Battery usage:
Shut down the power after removing the battery cathodal wire when checking and maintaining generator. Connect battery anode then cathode.
Stop charge quickly after the battery is fully charged.
When the battery is too hot in charging, recharge after stopping for a while.
6.The installation and maintenance of generator should be operated professional maintainer.
7. Restrict application of generator in high-hazard risk to causing fire area.
8. Don't pour waste oil into the sewer or the river to prevent environment pollution. The exhaust oil from generator must be stored in container. To deal with bad matter, such as fuel, oil cooling water, solvent, filter and battery, according to the law.
9.The exhaust gas and fuel of generator are poisonous. Please operate carefully.
CONTENTS
1.Main Technical Specifications and Data ......................................................................... 1
2.Configuration ............................................................. ............................................... 3
3.Preparation for Starting ............................................... ............................................... 5
4.Start the Generating Set .............................................. ............................................... 8
5.Operate the Generating Set ......................................... ............................................. 13
6.Load ........................................................................ ............................................. 14
7.Stop the Generating Set .............................................. ............................................. 18
8.Periodic Checks and Service ....................................... ............................................. 19
9.Long-term Storage ...................................................... ............................................. 22
10.Troubleshooting and Remedy .................................... ............................................. 23
11.Intelligent panel function ............................................ ............................................. 24
12.Electric diagram ........................................................ ............................................. 25
13.Appendix ................................................................. ............................................. 40
1
1. MAIN TECHNICAL SPECIFICATIONS AND DATA
1.1 MainTechnical Specifications and Data
2
3
2.CONFIGURATION
a.Parts names(KDE SERISE E type figs)
4
b.Parts names(KDE series T/T3/TA/TA3 type figs)
5
3.PREPARATION FOR STARTING
3.1 Selection and handing of the fuel oil
■Selection of fuel oil
Only use the light diesel, which is most suitable for the engine.
■Keep dust and water out of the fuel
When filling the fuel tank from drums, make sure that no dust or water is mixed in the fuel. Otherwise the serious fuel injection pump and nozzle problems will result.
■Do not overfill
Overfilling is very dangerous. Do not fill the tank beyond the top of the red plug inside the fuel oil filter.
! WARNING
■Refuel in a well-ventilated area with the engine stopped.
■Do not smoke or allow flames or sparks in the area where the engine is refueled or where the fuel oil stored.
■Do not overfill the tank,make sure the filler cap is securely closed after refueling.
■Be careful not to spill fuel when refueling.If any fuel is spilled, make sure the area is dry before starting the engine.
3.2 Check and refill the engine oil ! WARNING
■Always check the engine oil level with the generating set on a level surface before starting and refill if necessary.
■The engine may be dmaged if operated with insufficient engine oil,it is also dangerous to refill too much engine oil as sudden increase in engine speed may be caused by its combustion.
6
! CAUTION
■KDE series generating set are equipped with low oil warming system. This system will stops the engine automatically when the oil level falls below the lower level. This prevents accidents such as bearing seizures, etc.
■Select the most applicable engine oil
It is very important to select the applicable engine oil for keep up the performance and life of the generating set.If inferitor engine oil is used,or if your engine oil is not replaced periodically,the riskof piston seizure,piston ring sticking and accelerated wear of the cylinder liner, bearing and moving components increases significantly.So the generating set life will be shortened.Recommends CC/CD oil classified by API.Choose the applicable viscosity oil according to the local ambient temperature.
3.3 Service the air cleaner
1.Screw off the wing nut, remove the air cleaner cover and take out the element.
! CAUTION
■Do not wash the element with detergent.
■Replace the element when its output decrease or a bad exhaust color is noticed.
■Never run the generating set without the element,otherwise the rapid engine wear will result.
7
2.Reattach the air cleaner cover and screw on the wing nut
3.4 Check the generating set
1.Turn off the main switch and any other loads.
! WARNING
■ Be sure to turn off the main switch before starting.
■ The generating set should be earthed to prevent electric shocks.
! WARNING
■ The generating set should be earthed to prevent electric shocks.
! CAUTION
■The main switch should always be kept in the “ON” position during operation.
■Before starting the engine,be sure to turn the switches of the working instrument (lighting apparatus,motor,etc)to their “OFF” position If the switches are not “OFF”,the sudden application of load when the engine is started could be very dangerous.
3.5 Break-in period operation
The first 20hrs are the break-in period of the engine, the operator must obey to following items:
■Warm up the engine 5 minutes after the initial starting. Run the engine at low speed and zero load before the engine becomes warm.
8
■Avoid applying any heavy loads during the break-in period.recommends to run the engine at 3000r/min with 50% load in break-in period.
Replace the engine oil on time.
■Replace the engine oil while the engine is warm after 20-hours-running,the old engine oil will be drained out completely.
4.START THE GENERATING SET
! WARING
■Do not hook up tools or other apparatus to the generating set before starting.
4-1 Recoil starting
Start the engine according to the following procedures:
1.Open the fuel cock
9
2.Set the engine speed lever at the RUN position
3.Pull out the recoil starter handle
■Pull out the handle until you feel the resistance,then return it back to the initial position.
■Press down the decompression lever.It will return automatically when the recoil starter is pulled.
■Pull out the recoil starter handle briskly with both hands.
! Caution
■Do not allow the handle grip to snap back against the engine. Return it gently to prevent damage to the starter.
■When the engine is difficult to start in cold weather,remove the screw plug from the cylinder head cover and add 2cc engine oil.
! Caution
■Always screw on the screw plug on the cylinder head cover except filling,to prevent the rain and dirty flowing into the engine body.Otherwise the quick wear of the internal parts and other serious problems will result.
10
11
12
4.2 Electric starting
1.Starting(The prepartions for electric starting are the same as the same as for the recoil starting.)
■Open the fuel cock.
■Set the engine speed lever at “RUN”positon.
■Turn the starting key clockwise to
“START”position.
Remove your hand from the key as soon
as the engine starts.
If the starting motor does not start after
10 seconds, wait 15 seconds before
starting it again.
! CAUTION
Run the starting motor for long time will cost the battery power greatly even burn out the motor.
Always leave the starting key at “ON” position while the engine is running.
2.Battery
Check the battery voltage before
Starting generator set every time.
13
5.OPERATE THE GENERATING SET
5.1 Operate the generating set
1.Warm up the engine without load three minutes.
2.Concerning the generating set with Low Oil Warning System,check that the Oil Alarm Lamp is not lit.
! CAUTION
■For the generating set with Low Oil Warning System,the Oil Alarm Lamp will activated by low oil pressure or engine oil shortage, simultaneously,the engine will stop.The engine will stop immediately if restarted without refilling the engine oil.Check the oil level and refill.
■Do not loosen or readjust either the engine speed limiting bolt or fuel injection limiting bolt,otherwise,the performance will be affected.
5.2 Checks during the running
1.Whether there is abnormal sound or vibration;
2.Whether the engine misfires or runs rough;
3.Check the color of the exhaust.(Is it black or too white?)
If you notice any of the above-mentioned phenomenon happened,stop the engine and find out the fault cause or contact with agent.
14
! CAUTION
■If the engine has been running,the muffler will be very hot.Be careful not to touch the muffler.
■Never refill the fuel tank while the engine is running.
6.LOAD
! CAUTION
■Do not start 2 or more machines simultaneously.Start them one by one
■Do not use floodlights together with other machines.
6.1 AC application
1.Be sure to run the generating set at rated speed,otherwise AVR (Automatic Volt-age Regulator)will produce the forced excitation.If the running is for a long time under such condition,AVR will be burned out.
2.After switching on the air switch,observe the voltmeter on the panel of the control cabinet,the voltmeter should point to 230V±5%(50Hz)for single-phase generating set;400V±5%(50Hz)for three-phase generating set,then the loading can be carried out.
15
3. When the double voltage generating set changes over the voltage, the air switich should be set at“OFF”position Otherwise the generating set and electric devices will be burned out and damaged
4. Connect the equipment to the gene~ting set in order.For the ma~er of the motor load, firstly the heavy—duty motor should be connected,then the light—duty motors.
If the operation is false,the generating set will lag or stop suddenly. It is neces—
sary to unload the generating set immediately and turn off the main switch and do checks
5.Three—phase generating set
■Balance three phases during the operation.Stop the engine for check if the toler-ance exceed 20%
■The load for each phase must below the rated load as well as the current must less than rated current.
■A,B,C,D(or U,V,W,N)phase arrangement should be from left to right,or clockwise.
Concerning starting the three phase asynchronous motors, first start the high power motors,then start the low-power motors.
!NOTE
■If overloading of the circuit trips the AC circuit protector,reduce the electrical load on the circuit,and wait a few minutes before resuming operation.
Breaker can prevent the electric shock that has equal degree and performance
Electrical equipment(including electrica
f need to replace,please replace one
nes and plugs connection)could not be
defective By the effect of mechanical stress,make sure to use the rubber
sheathed flexible cable or analog faccord with I EC245—41
LimiI length of electric line when using the extension line or distributed network is:
less Ihan 60m for cables of 1 5mm:and less Ihan 1 OOm for cables of 2 5mm:
16
6.2 D.C application
1.DC teminals are only for charging 12V battery.
2.Set the air switch at “OFF”position while charging.On the 12V output teminals,a charge switch can be connected so the switch can be used for on-and-off purpose.
3.Concerning the automatic type battery with the leads,be sure to disconnect the negative leads of the battery while charging. !CAUTION
■Connect the positive and negative poles of the battery with the position and negative poles of DC terminals separately.Do not confuse them,otherwise the battery and generating set will burn out.
■Do not connect the positive pole of the battery with its negative pole,otherwise the battery damage will result.
■Do not connect the positive pole of the DC terminal with its negative pole,otherwise the generating set damage will result.
■When a large capacity battery is charged,excessive current flows,the fuse for the direct current will burn out.
■Do not start the generating set while it is still connected with the battery.
Do not use DC12V and AC at the same time.
!CAUTION
■To prevent from creating a spark near the battery,always connect the charging cables to the battery first and only then to the generating set.When disconnecting,you should disconnecting,you should disconnect the cables at the generating set first.
■Charge the battery at a well-ventilated place.
■Before charging,remove the cap from each cell of the battery.
■Stop charging if the clectrolyte temperature exceed 45℃
17
6.3 Electrical appliance particularly motor-driven equipment will produce very high current while starting, the below table provides the reference for connecting these appsratus to the generators set.
18
7.STOP YOUR GENERATING SET
1.Disconnect the load from the generating set.
2.Turn off the air switch of the generating set.
3.Set the speed lever at”RUN”position,run the generating set without load for about 3minutes.Do not stop the engine suddenly,otherwise the temperature will increase abnormally,the nozzle will blocked and the generating set will be damaged.
■Press down the stop lever.
■Concerning the electric starter,turn the key to “OFF”.
■Turn the fuel cock lever to “S”position.
■Pull out the recoil starter handle untile you feel resistance (at this position,both intake/exhaust valve are closed.)and leave the handle in this position. This prevents the engine from rust.
!WARNING
■ If the engine keep on running even after the speed lever is placed at the “STOP”position,either turn the fuel cock to the “CLOSE”position or loosen the nut of high pressure fuel pipe on the pump side to stop the engine.
■ Do not stop the engine with the decompression lever.
■Do not stop the generating set with load.Stop it after the load removed.
19
8.PERIODIC CHECK AND SERVICE
Periodic check and service are very important for keeping the engine in good condition and durable. The chart below indicates what checks to make and when to make them.
! WARNING
■Shut off the engine before performing any service. If the engine must be run,make sure the area is well ventilated.The exhaust contains poisonous carbon monoxide gas.
■After the generating set has been used,clean it immediately with a cloth to prevent corrosion and to remove sediment.
20
8.1 Replace engine oil
Remove the oil filler cap.Remove the drain plug and drain the old oil while the engine is still warm.The plug is located on the bottom of the cylinder block.Tighten the drain plug and refill with the recommended oil.
8.2 Clean the engine oil filter
Cleaning
time
Every 6 months or 500
hours
Replace if necessary
8.3 Replace the air cleaner element
Do not clean the air cleaner element with
Detergent.
Replace time
Every 6 months or 500
hours
!CAUTION
■ Never run the engine without the element or with a defective element.
8.4 Clean and replace fuel oil filter
The fuel oil filter also has to be cleaned regularly to insure maximum engine output
Clean time
Every 6 months or 500 hrs
Replace time
Every year or 1000 hrs
21
1.Drain out the fuel from the fuel tank
2.Drain out the fuel from the fuel lank.Screw off the smalI screw of the fuel cock and pull out the filter from the filler port, Wash the filter thoroughly with dieseI fuel.
3. Loosen the fastening nut,bottom cover and delivery discs for cleaning the deposit carbon.
8.5 Tighten cylinder head bolt
Tightening the cylinder head bolt requires a special tool Do not try yourself.Contact
with KIPOR agent
8.6 Check the injection nozzle and fuel injection pump
1 Adjust the clearance of the intake/exhaust valves.
2 Grind the intake/exhaust valves.
3.Replace the piston ring
! WARNING
■Do not perform the injection nozzle test near an open fire or any other kind of fire The fuel spray may ignite Do not expose bare skin to the fuel spray.The fuel may penetrate the skin and cause injury to the body Always keep your body away from the nozzle.
8.7 Check the generating set carbon brush and slip ring
Often check the generating set carbon brush and slip ring.Readjust if there is spark.
22
9.LONG-TERM STORAGE
If store the generating set for long periods,make the following preparations.
1 Operate the engine for about 3 minutes and then stop.
2 Stop the engine Drain the engine oil while the engine is still warm and fill with fresh oil.
3 Remove the screw plug on the cylinder head cover and refill 2cc engine oil,then put the plug in place.
4.■Recoil starting:
Push the decompression lever down(Non—compression position)and hold it while you pull the recoil starter2-3 times.(Do not start the engine)
■Electric starting:
Turn the engine 2-3 seconds with the decompression lever set at the non--com--pression position.a(chǎn)nd the starting key at the START position fDo not start the engine)
5 Pull the decompression lever up Pull the recoil starter slowly.Stop when you feel resistance(at this position,both inlake/exhaust valves are closed to prevent the engine from the rust.)
6.Wipe off the oil and dirt from the engine and store in a dry place.
23
10.TROUBLESHOOTING AND REMEDY
24
11.INTELLIGENT PANEL FUNCTIONS
Indication lamp functions:
VOLT: Indicating generator output voltage
PORER (VA): Indicating generator output power
FRE: Indicating generator frequency
RUNTIME: Indicating generator total runtime
BATVOLT: Indicating battery voltage
Button function:
FUN: Switching indicating content on the display. Including output voltage,output power, frequency, total runtime and battery voltage.
25
12.EIECTRIC DIAGRAM
12.1 KDE3500X Electric diagram
26
12.2 KDE6500E Electric diagram
27
12.3 KDE6500E3/X3 Electric diagram
Description:For set X3 type,the components in the two-point-and-line box are not mounted.
28
12.4 KDE3500ET Electric diagram
29
12.5 KDE6500T3/KDE6700T3 Electric diagram
30
12.6 KDE6700T Electric diagram
31
12.7 KDE6700TA Electric diagram(1)
32
12.7 KDE6700TA Electric diagram(2)
33
12.8 KDE6700TA3 Electric diagram(1)
34
12.8 KDE6700TA3 Electric diagram(2)
35
12.9 KDE2200/KDE3500C Electric diagram(2)
36
12.10 KDE2200X/KDE2500X/KDE5000X/KDE6500X Electric diagram(single voltage output)
37
12.11 KDE2200X/KDE2500X/KDE5000X/KDE6500X Electric diagram(double voltage output)
38
12.12 KDE2200E/KDE2500E/KDE5000E/KDE6500E Electric diagram(double voltage output)
39
12.13 KDE2200E/KDE2500E/KDE3500E/KDE5000E Electric diagram(double voltage output)
40
12.14 KDE5000T/ KDE6500T Electric diagram
41
12.15 KDA6700TA Electric diagram
42
13.APPENDIX
1. The choice of the electric cable
The choice of the electric cable depends on the allowable current of the cable
and the distance between the load and the generator And the cable section
should be big enough.
If the current in the cable iS bigger than the alIowable CUrrent it WiII become over
hot and the cable WiII be burnt lf the cable iS long and thin the inpuI VOltage of
the electric appliance wilI be not enough causing that the geRerator doesn’t sta rt
In the following formula yoU can calculate the value of the potential”e”
Potential(V)=581×area Section Length ×Current(A)× 3 The relations among of the allowable current,and length,section of the Insulating
cable(single core,multi—core)are as follow:
(Presume that the use voltage is 220V and the potential is below 1 0V.
Ambient temperature:25℃
Note:The variation of temperature and the laying of cables will influence the cu rrent capacityof
cables,the table above is just used for reference.
43
2.Modified coefficient table of ambient condition power
The conditions of generator rated output:
Altitude:0 m Ambient temperature:25℃ Relative humidity:30%
Ambient modified coefficient:C(Relative humidity 30%)
Note:When the relative humidity is 60%,the modified coefficient is C-0 01
When the relative humidity is 80%,the modified coefficient is C-0 02
When the relative humidity is 90%,the modified coefficient is C-0 03
When the relative humidity is 1 00%,the modified coefficient is C-0 04
Counting example:
When the rated power of generator is PN=5KW,altitude is 1 000m, ambient temperature is 35~C, relative humidity is 80%, the rated power of generator is:
P=Pn×(C-0 02)=5×(0 82-0 02)=4KW

Unitrans世聯(lián)翻譯公司在您身邊,離您近的翻譯公司,心貼心的專業(yè)服務(wù),專業(yè)的全球語言翻譯與信息解決方案供應(yīng)商,專業(yè)翻譯機(jī)構(gòu)品牌。無論在本地,國內(nèi)還是海外,我們的專業(yè)、星級體貼服務(wù),為您的事業(yè)加速!世聯(lián)翻譯公司在北京、上海、深圳等國際交往城市設(shè)有翻譯基地,業(yè)務(wù)覆蓋全國城市。每天有近百萬字節(jié)的信息和貿(mào)易通過世聯(lián)走向全球!積累了大量政商用戶數(shù)據(jù),翻譯人才庫數(shù)據(jù),多語種語料庫大數(shù)據(jù)。世聯(lián)品牌和服務(wù)品質(zhì)已得到政務(wù)防務(wù)和國際組織、跨國公司和大中型企業(yè)等近萬用戶的認(rèn)可。 專業(yè)翻譯公司,北京翻譯公司,上海翻譯公司,英文翻譯,日文翻譯,韓語翻譯,翻譯公司排行榜,翻譯公司收費(fèi)價格表,翻譯公司收費(fèi)標(biāo)準(zhǔn),翻譯公司北京,翻譯公司上海。
  • “貴司提交的稿件專業(yè)詞匯用詞準(zhǔn)確,語言表達(dá)流暢,排版規(guī)范, 且服務(wù)態(tài)度好。在貴司的幫助下,我司的編制周期得以縮短,稿件語言的表達(dá)質(zhì)量得到很大提升”

    華東建筑設(shè)計(jì)研究總院

  • “我單位是一家總部位于丹麥的高科技企業(yè),和世聯(lián)翻譯第一次接觸,心中仍有著一定的猶豫,貴司專業(yè)的譯員與高水準(zhǔn)的服務(wù),得到了國外合作伙伴的認(rèn)可!”

    世萬保制動器(上海)有限公司

  • “我公司是一家荷蘭駐華分公司,主要致力于行為學(xué)研究軟件、儀器和集成系統(tǒng)的開發(fā)和銷售工作,所需翻譯的英文說明書專業(yè)性強(qiáng),翻譯難度較大,貴司總能提供優(yōu)質(zhì)的服務(wù)。”

    諾達(dá)思(北京)信息技術(shù)有限責(zé)任公司

  • “為我司在東南亞地區(qū)的業(yè)務(wù)開拓提供小語種翻譯服務(wù)中,翻譯稿件格式美觀整潔,能最大程度的還原原文的樣式,同時翻譯質(zhì)量和速度也得到我司的肯定和好評!”

    上海大眾

  • “在此之前,我們公司和其他翻譯公司有過合作,但是翻譯質(zhì)量實(shí)在不敢恭維,所以當(dāng)我認(rèn)識劉穎潔以后,對她的專業(yè)性和貴公司翻譯的質(zhì)量非常滿意,隨即簽署了長期合作合同!

    銀泰資源股份有限公司

  • “我行自2017年與世聯(lián)翻譯合作,合作過程中十分愉快。特別感謝Jasmine Liu, 態(tài)度熱情親切,有耐心,對我行提出的要求落實(shí)到位,體現(xiàn)了非常高的專業(yè)性。”

    南洋商業(yè)銀行

  • “與我公司對接的世聯(lián)翻譯客服經(jīng)理,可以及時對我們的要求進(jìn)行反饋,也會盡量滿足我們臨時緊急的文件翻譯要求。熱情周到的服務(wù)給我們留下深刻印象!”

    黑龍江飛鶴乳業(yè)有限公司

  • “翻譯金融行業(yè)文件各式各樣版式復(fù)雜,試譯多家翻譯公司,后經(jīng)過比價、比服務(wù)、比質(zhì)量等流程下來,最終敲定了世聯(lián)翻譯。非常感謝你們提供的優(yōu)質(zhì)服務(wù)!

    國金證券股份有限公司

  • “我司所需翻譯的資料專業(yè)性強(qiáng),涉及面廣,翻譯難度大,貴司總能提供優(yōu)質(zhì)的服務(wù)。在一次業(yè)主單位對完工資料質(zhì)量的抽查中,我司因?yàn)槎砦姆g質(zhì)量過關(guān)而受到了好評。”

    中辰匯通科技有限責(zé)任公司

  • “我司在2014年與貴公司建立合作關(guān)系,貴公司的翻譯服務(wù)質(zhì)量高、速度快、態(tài)度好,贏得了我司各部門的一致好評。貴司經(jīng)理工作認(rèn)真踏實(shí),特此致以誠摯的感謝!”

    新華聯(lián)國際置地(馬來西亞)有限公司

  • “我們需要的翻譯人員,不論是筆譯還是口譯,都需要具有很強(qiáng)的專業(yè)性,貴公司的德文翻譯稿件和現(xiàn)場的同聲傳譯都得到了我公司和合作伙伴的充分肯定!

    西馬遠(yuǎn)東醫(yī)療投資管理有限公司

  • “在這5年中,世聯(lián)翻譯公司人員對工作的認(rèn)真、負(fù)責(zé)、熱情、周到深深的打動了我。不僅譯件質(zhì)量好,交稿時間及時,還能在我司資金周轉(zhuǎn)緊張時給予體諒!

    華潤萬東醫(yī)療裝備股份有限公司

  • “我公司與世聯(lián)翻譯一直保持著長期合作關(guān)系,這家公司報(bào)價合理,質(zhì)量可靠,效率又高。他們翻譯的譯文發(fā)到國外公司,對方也很認(rèn)可!

    北京世博達(dá)科技發(fā)展有限公司

  • “貴公司翻譯的譯文質(zhì)量很高,語言表達(dá)流暢、排版格式規(guī)范、專業(yè)術(shù)語翻譯到位、翻譯的速度非?臁⒑笃诜⻊(wù)熱情。我司翻譯了大量的專業(yè)文件,經(jīng)過長久合作,名副其實(shí),值得信賴!

    北京塞特雷特科技有限公司

  • “針對我們農(nóng)業(yè)科研論文寫作要求,盡量尋找專業(yè)對口的專家為我提供翻譯服務(wù),最后又按照學(xué)術(shù)期刊的要求,提供潤色原稿和相關(guān)的證明文件。非常感謝世聯(lián)翻譯公司!”

    中國農(nóng)科院

  • “世聯(lián)的客服經(jīng)理態(tài)度熱情親切,對我們提出的要求都落實(shí)到位,回答我們的問題也非常有耐心。譯員十分專業(yè),工作盡職盡責(zé),獲得與其共事的公司總部同事們的一致高度認(rèn)可!

    格萊姆公司

  • “我公司與馬來西亞政府有相關(guān)業(yè)務(wù)往來,急需翻譯項(xiàng)目報(bào)備材料。在經(jīng)過對各個翻譯公司的服務(wù)水平和質(zhì)量的權(quán)衡下,我們選擇了世聯(lián)翻譯公司。翻譯很成功,公司領(lǐng)導(dǎo)非常滿意!

    北京韜盛科技發(fā)展有限公司

  • “客服經(jīng)理能一貫熱情負(fù)責(zé)的完成每一次翻譯工作的組織及溝通。為客戶與譯員之間搭起順暢的溝通橋梁。能協(xié)助我方建立專業(yè)詞庫,并向譯員準(zhǔn)確傳達(dá)落實(shí),準(zhǔn)確及高效的完成統(tǒng)一風(fēng)格!

    HEURTEY PETROCHEM法國赫銻石化

  • “貴公司與我社對翻譯項(xiàng)目進(jìn)行了幾次詳細(xì)的會談,期間公司負(fù)責(zé)人和廖小姐還親自來我社拜訪,對待工作熱情,專業(yè)度高,我們雙方達(dá)成了很好的共識。對貴公司的服務(wù)給予好評!”

    東華大學(xué)出版社

  • “非常感謝世聯(lián)翻譯!我們對此次緬甸語訪談翻譯項(xiàng)目非常滿意,世聯(lián)在充分了解我司項(xiàng)目的翻譯意圖情況下,即高效又保質(zhì)地完成了譯文。”

    上海奧美廣告有限公司

  • “在合作過程中,世聯(lián)翻譯保質(zhì)、保量、及時的完成我們交給的翻譯工作?蛻艚(jīng)理工作積極,服務(wù)熱情、周到,能全面的了解客戶的需求,在此表示特別的感謝!

    北京中唐電工程咨詢有限公司

  • “我們通過圖書翻譯項(xiàng)目與你們相識乃至建立友誼,你們報(bào)價合理、服務(wù)細(xì)致、翻譯質(zhì)量可靠。請?jiān)试S我們借此機(jī)會向你們表示衷心的感謝!”

    山東教育出版社

  • “很滿意世聯(lián)的翻譯質(zhì)量,交稿準(zhǔn)時,中英互譯都比較好,措辭和句式結(jié)構(gòu)都比較地道,譯文忠實(shí)于原文。TNC是一家國際環(huán)保組織,發(fā)給我們美國總部的同事后,他們反應(yīng)也不錯。”

    TNC大自然保護(hù)協(xié)會

  • “原英國首相布萊爾來訪,需要非常專業(yè)的同聲傳譯服務(wù),因是第一次接觸,心中仍有著一定的猶豫,但是貴司專業(yè)的譯員與高水準(zhǔn)的服務(wù),給我們留下了非常深刻的印象。”

    北京師范大學(xué)壹基金公益研究院

  • “在與世聯(lián)翻譯合作期間,世聯(lián)秉承著“上善若水、厚德載物”的文化理念,以上乘的品質(zhì)和質(zhì)量,信守對客戶的承諾,出色地完成了我公司交予的翻譯工作!

    國科創(chuàng)新(北京)信息咨詢中心

  • “由于項(xiàng)目要求時間相當(dāng)緊湊,所以世聯(lián)在保證質(zhì)量的前提下,盡力按照時間完成任務(wù)。使我們在世博會俄羅斯館日活動中準(zhǔn)備充足,并受到一致好評。”

    北京華國之窗咨詢有限公司

  • “貴公司針對客戶需要,挑選優(yōu)秀的譯員承接項(xiàng)目,翻譯過程客戶隨時查看中途稿,并且與客戶溝通術(shù)語方面的知識,能夠更準(zhǔn)確的了解到客戶的需求,確保稿件高質(zhì)量!

    日工建機(jī)(北京)國際進(jìn)出口有限公司

15801211926

18017395793
點(diǎn)擊添加微信

無需轉(zhuǎn)接等回電

安阳县| 翼城县| 绥棱县| 大城县| 井研县| 保定市| 安溪县| 海南省| 吉安市| 元朗区| 广灵县| 汉寿县| 永仁县| 阳东县| 北宁市| 乐山市| 巢湖市| 罗定市| 丰城市| 深水埗区| 遵义县| 红桥区| 宿迁市| 武安市| 奎屯市| 茶陵县| 赤城县| 乌拉特前旗| 怀柔区| 巴林左旗| 武穴市| 西乡县| 连山| 河南省| 盐山县| 连江县| 绥芬河市| 祁连县| 上思县| 沧州市| 谢通门县|